May 13, 2008...1:34 pm

Downhill Slope…

Jump to Comments

Almost all the cabinets have been built, the basement exterior door came in and I installed it with a friend, and now the sheetrock has been hanged, taped, and textured. We even primed the walls in the kitchen and bathroom last night before heading home. Today I have to do some regular work stuff, but then head over to meet the electrician for his final trim-out, meet the gutter guys so they can do their part, and let in the furnace guy to fix our ancient gas furnace’s transformer. I have to install tile backerboard, install all the cabinetry in the kitchen and bath, install all the appliances, install 2 more doors, tons of fixtures, put in the kitchen floor, and prep the place for carpet install…and we’re still waiting for our stimulous check, and a refund check from FHA for buying all this stuff, none of which we had the $$$ for. I know I’m forgetting something. Oh yeah, move in before the 1st. Breathe……….

I can’t believe we are past the halfway point. The past 13 days have been grueling, but will be worth it. More pics on the way!

2 Comments


Leave a Reply