May 24, 2008...5:24 pm

Exhaustion Sets In…

Jump to Comments

Almost there. Almost there. That’s been my mantra lately. Too many 18-hour days trying to get this place liveable. Almost there. Here are a few shots (most of them are outdated now, but I haven’t taken any new shots to update the progress). These are say from 6 to 4 days old.

IMG_1143.JPG
INSTALL ME – appliances waiting to become part of the kitchen

IMG_1141.JPG
HOT AND COLD – hot water at the hose bib outside. Pure genius.

IMG_1147.JPG
A FEW CABS – some upper cabs and a microwave welcome the lower cabs mock-up. Paint is on the walls at this point.

UPDATE-A-ROO: Vinyl floors are in, carpet is in, painting is done for the most part, fixtures have started going in, new front window is installed, bitch-ass MF’ing ceiling fan is in and operational, and tile in bathroom is finished. Today is cabinets, cabinets, cabinets, and countertops if there’s time. Then work at 5. More pics sooooooooooooooooooooon…

Leave a Reply